A load bank is a device that applies an external electrical load to your generator, simulating real-world demand. During load bank testing, we connect this device to your generator to measure its electrical capacity and performance under load.
This process is an essential part of proactive generator maintenance because it:
Without regular load testing, standby generators may appear functional but fail when pushed to their limits.
Generators that rarely run at full capacity can suffer from issues such as:
Load bank testing burns off excess fuel and carbon buildup, ensuring cleaner operation and better efficiency. It also verifies your system’s electrical connections, battery capacity, and fuel system health, giving you peace of mind that your generator won’t let you down during an outage.
For industries that rely on mission-critical backup power—such as hospitals, healthcare facilities, emergency services, and data centers—load bank testing isn’t optional, it’s required.
At Islamorada Power, we perform load banking up to 600kW in compliance with:
By following these best practices, we ensure your generator meets operational standards in emergencies, whether for residential, commercial, or critical infrastructure use.
Islamorada Power proudly offers load bank testing services across Monroe County, including:
Wherever you’re located in the Keys, we’ll ensure your generator is ready when you need it most.
Don’t wait until the next hurricane or power outage to discover your generator’s limits. With professional load bank testing from Islamorada Power, you can be confident your backup system is fully capable of supporting your home or business when the grid goes down.
📞 Call Today to Schedule Load Bank Testing
or Request a Free Estimate →
A 4-hour load bank test is typically performed to comply with NFPA 110 standards for emergency and standby power systems. During the test, the generator is run under a progressive load—usually starting at 25%, then increasing to 50%, 75%, and finally 100% of its rated capacity. This ensures the generator can sustain a full electrical load for an extended period while burning off excess fuel and carbon buildup. The test also confirms that all systems (fuel, cooling, exhaust, and electrical connections) function correctly under real-world conditions.
For most commercial and mission-critical facilities, NFPA guidelines recommend annual load bank testing. However, for residential and non-critical commercial systems in the Florida Keys, testing once a year is still best practice, especially before hurricane season. Regular testing ensures your generator is fully prepared to deliver reliable power when outages occur.
The length of a load bank test depends on the generator size, system setup, and testing requirements. While some assessments may take as little as 1–2 hours, a comprehensive load bank test usually lasts 2–4 hours. This timeframe allows technicians to gradually apply electrical loads, measure performance, and verify the generator’s ability to sustain long-duration usage without issues.
The primary purpose of a load bank test is to verify that your generator can perform under real-world power demands. While routine start-ups confirm that the engine can run, they don’t show how the generator will perform under actual electrical load. Load testing: